East Canton Veterinary Clinic Goes Solar

Home » Projects » East Canton Veterinary Clinic Goes Solar
SYSTEM SIZE
35.6 kW (two separate installations)
INSTALLATION TYPE
Roof Mount
INSTALLATION DATE
January 2018 (22.77 kW) and September 2020 (12.87 kW)
LOCATION
East Canton, OH


ANNUAL ENVIRONMENTAL OFFSET
31.4 tons of CO2, or 66.3 barrels of oil

Redstar Veterinary Clinic energizes their East Canton small animal and haul-in large animal facility with a 35.6 kW roof-mounted solar energy system. Their solar was installed in two phases, the first being a 22.77 kW in 2018 and the second in 2020 was a 12.87 kW. 

Quickly Estimate Your Solar Price, ROI, and Savings

Wondering what solar really costs and how quickly it pays back? Our free Solar Estimator tool gives you instant answers. In just a few clicks, you’ll see a ballpark system cost, estimated savings, ROI, and payback period. No salesperson required.

Solar Price Estimator Results On Phone

View More of Our 2,000+ Solar Installations